Post-Construction Cleaning - Castelatto
Compartilhar

Post-Construction Cleaning

Post-Construction Cleaning

Caso sua dúvida não seja solucionada em nossas respostas, envie-nos um e-mail
para sac@castelatto.com.br ou utilize nosso formulário clicando aqui.

What is the minimum time to carry out the post-construction cleaning?

After-construction cleaning must be carried out at least 72 hours after the grouting.

What is the type of correct detergent for post-work cleaning?

We recommend the use of alkaline detergent.

What is the correct procedure for floor cleaning?

Apply the product and rub carefully using a nylon bristle brush or wipe. Wash with plenty of water and never let the detergent dry on the part.
NOTE: Do not use acids or other products not indicated by Castelatto.

What is the correct procedure for dilution of Alkaline Detergent?

For general cleaning, dilute the detergent in water in the ratio 1:10.
For cleaning during the construction, dilute the detergent in water in a ratio of 1: 5.
For post- construction cleaning, use the product with NO dilution.